Wind Tex Energy started development activity in 2007.  A co-development agreement was made with Mesa Power Group in 2012.  Starwood Energy Group purchased the project in September of 2013.  Financing for the wind farm closed on December 31, 2013.  Construction on the 377.4 MW project started in 2013, and the project is slated to be operational in October of 2014.  It is using GE 1.7 MW turbines.

This project is located in both Borden and Lynn Counties of Texas, approximately 45 miles southeast of Lubbock.  This project will connect to the 345 kV bus at Wind Energy Transmission Texas (WETT) Long Draw Switching Station in Borden County.  The interconnection agreement was signed in March of 2012.

operational projects

Turkey Track Energy Center

The Turkey Track Energy Center went into commercial operation in December 2008. It is located about 30 miles southwest of Abilene in Nolan County, Texas. The project contains 113 General Electric wind turbines rated at 1.5 MW each for a total size of 169.5 MW. The estimated annual energy production capability is 620 million kW […]

VIEW THIS PROJECT
VIEW more PROJECTS:
Completed/Operational - Projects in Development

NOT JUST HOT AIR

  • July 9th, 2013Welcome!

    Welcome to the new blog for Wind Tex Energy, a regular source for information about Wind Tex Energy projects and

VIEW ALL POSTS